Tuesday, February 21, 2006

setting up



insideout opens on wednesday.

this basically means that the gang was at objectifs for most of the day mounting pictures onto the wall (the fairly easy part) and drilling holes in the ceiling (much much harder) to install hooks. of course murphy's law came into effect and we HAD to run into some problems with the drilling (in the form of a metal beam lurking beneath the concrete). drilling of the last two holes has been postponed to later this evening when we get a more powerful drill and some better drill bits.

i ended up going late (as usual), but this time with an excuse having spent almost the whole day at the asian aerospace (more pictures to come from that soon...i hope) but still managed to find the time to help out a little.


oh, and thanks to those who came to give moral support, even when they had much better things to do with their time.

0 Comments:

Post a Comment

<< Home